• (360) 676-6974
  • Calendar
  • Library
  • Title VI
  • Contact Us
  • About
    • Agreements
    • Audits
    • Budget
    • Mission Statement
    • Policies
    • Public Notices
    • Title VI
    • WCOG Bylaws
  • Meetings
    • Boundary Review Board
    • Community Transportation Advisory Group (CTAG)
    • Council Board
    • Transportation Policy Board
    • Transportation Technical Advisory Group
  • Plans
    • Human Services Transportation Planning
    • Intelligent Transportation Systems
    • Public Participation Plan
    • Regional Safety Action Plan
    • Regional Transportation Plan
    • Scenic Byways Plan
  • Programs & Studies
    • Border Planning (IMTC)
    • Household Travel Study
    • North Sound Transportation Alliance
    • Past Programs
    • Public Engagement Survey
    • Transportation Improvement Program
    • Unified Planning Work Program
    • Whatcom Smart Trips
  • Maps & Data
    • GIS Maps
    • Traffic Counts
    • Transportation Model
  • Get Involved
    • How to Participate
  • Agreements
  • Border
  • BRB
  • Data
  • Financial Info
  • Maps
  • Meetings
  • packets
  • Plans
  • Policies
  • Programs
  • Projects & Studies
  • Public Engagement
  • Reference
  • Reports

1998 Mt. Baker Highway: Interpretive Signs and Sites Project Summary

2000 Cross-Border Trade & Travel Study Report

2000 PACE Report 1: Market Research

2001 Cross-Border Transit Study White Paper #1: Preliminary Market Analysis & Review

2001 Cross-Border Transit Study White Paper #2: Carpool/Vanpool Services

2001 Cross-Border Transit Study White Paper #3: Survey of Existing Cross-Border Transit Services

2001 PACE Report 2: Marketing Plan

2001 PACE Report 3: Program Improvements

2001 PACE Report 4: Barriers to Joint Administration

2001 PACE Report 5: Design of a Jointly Administered Program

2002 Cascade Gateway Rail Study Final Report

2002 PACE Report 6: Project Performance Review

2003 Abbotsford-Sumas Border Improvement Project Final Report

2003 ITS – CVO Border Crossing Deployment Evaluation Executive Summary

2003 ITS – CVO Border Crossing Deployment Evaluation Final Report

2003-2008 FAST Outreach Final Report

2004 Cross-Border Shortsea Shipping Study Phase I Report

2004 Cross-Border Shortsea Shipping Study Phase I Summary

2004 NEXUS Program Marketing Campaign Project Summary

2004 Trasportation Technology at the WA-BC Border Phase III Report

2006 Pacific Highway Commercial Vehicle Operations Survey

2006 Passenger Only Ferry Study Final Report

2006 Summary of Facilitating, Promoting, and Monitoring the FAST Program

2007 BC - WA ATIS Data Management System Project Report

2007 Border Circulation Analysis Workplan

2007 Cross-Border Shortsea Shipping Study Phase II Report

2007 Preliminary Overview of NEXUS Data

2007/2008 Passenger Vehicle Survey Final Report

2007/2008 Passenger Vehicle Survey Questions

2007/2008 Passenger Vehicle Survey Schedule

2008 Border Circulation Analysis FAST Technical Report

2008 Border Circulation Analysis NEXUS Technical Report

2008 Border Circulation Analysis Stakeholder Interviews

2008 Ferry Study & Business Plan

2009 Blaine Interchange Justification Report Executive Summary

2009 Border Circulation Analysis Systems Definition Report

2009 IMTC Commercial Vehicle Operations Survey Final Report

2010 Border Circulation Analysis Cross-Border Road Network

2011 Border Circulation Analysis Sector Profile: Cross-Border Flows & Systems

2011 Border Data Warehouse Report 1: Final Report

2011 Border Data Warehouse Report 2: Project ITS Architecture

2011 Border Data Warehouse Report 3: Recommendations for BIFA and Architecture Developers

2013/2014 IMTC Passenger Vehicle Survey Final Report

2013/2014 IMTC Passenger Vehicle Survey Questions

2014 IMTC Passenger Vehicle Survey Database Readme File

2015 RFID Business Case

2017 Border Freight Operations Compilation of Products

2017 Data Feed to Border ATIS Final Report

2018 IMTC Bus Survey Report

2018 Whatcom Regional Transportation Study Analysis Report

2018 Whatcom Regional Transportation Study Methodology Report

2018/2019 IMTC Passenger Vehicle Intercept Survey Technical Memo

2018/2019 Passenger Intercept Survey Description

2018/2019 Passenger Intercept Survey Questions

2020 IMTC Simulation Modeling of Commercial Vehicle Processing at the Pacific Highway Port-of-Entry

2021 Whatcom Public Engagement Survey Final Report

2022 IMTC Commercial Vehicle Operations Study Data Collection Report

2022 IMTC Commercial Vehicle Operations Study Final Report

ABIS Report 1: Current State Assessment & Existing Technology Review

ABIS Report 2: Concept Exploration & Recommendations

ABIS Report 3: Concept of Operations

ABIS Report 4: Benefit Cost Analysis

ABIS Report 5: Implementation Plan

ABIS Report 6: High-Level Design

Border Wait Time System Validation & Calibration Backgrounder

Cascade Gateway ABIS Project Stages 1 & 2 Brief

Cascade Gateway Border Data Warehouse 3.0 Concept of Operations

Cascade Gateway Border Data Warehouse 3.0 System Requirements

COVID-19 Impacts on Cascade Gateway Cross-Border Freight Report

Dynamic Border Management Project Scope of Work

I-5 Survey

Near-Border Operations & Logistical Inefficiencies at the Peace Arch Border

STBG-TA 2023 Form

U.S. - Canada Border Data Warehouse Final Report

Quick Links
  • About
  • Calendar
  • Contact Us
Contact Us

Phone: (360) 676-6974
Email: wcog@wcog.org

Address

314 E. Champion St.
Bellingham, WA 98225

View in Map >

© WCOG - Site by Ravenna